Plan to reset and upgrade on August 13, and it is estimated that the mainnet will be launched on August 29

1. Modify the analysis unit of FLW when acquiring trading channels

2. Integrate the use of BLST signature library for BLS signature, instead of FFI library

3. Fix the problem of continuous integration test (CI Test) failure

4. Optimize storage and retrieval market transaction speed

5. Realize data splitting and receiving, and optimize the algorithm for retrieving market data

6.The estimated time for reset and upgrade is 3 hours